Projects

Ras Tanura (IWWTP/BOOT)

Ras Tanura (IWWTP/BOOT)
0
m3/day IWWTP capacity
0
km Transmission lines
CONTRACT TYPE
BOOT
LOCATION
Ras Tanura
FINANCIAL CLOSE
Q3 2024
TERM
25 years
PROJECT STATUS
Active
CLIENT
Saudi Aramco
PROJECT SCOPE
  • Develop an Industrial Wastewater Treatment Plant (IWWTP) with a connected capacity of 20,000 m³ and a wet air oxidation plant to treat spent caustic with a capacity of 1.2 m³/ hour.
  • A wastewater transmission pipeline and an effluent transmission pipeline; 7 km apart between the Ras Tanura refinery and the IWWTP plant.
Client
Client